Building-material godown design 15 × 30 m starting form
Bring material display, bulk stock and dispatch into one open-front concept. Generic rack and pallet envelopes help you discuss how customers, workers and loading equipment will share the space.
FURNISHED CONCEPT- Floor footprint
- 450 m²15 × 30 m width × length
- Eave height
- 5.5 mCheck actual underside clearance
- Bays along the length
- 5 bays6.00 m centre-to-centre
- Wall arrangement
- Three sides clad · open frontStructural members remain at openings
See what changes the steel quantity.
The range compares 4, 5, 6 bays at the same width, length, eave, roof, openings and selected sections. It describes those modelled arrangements; it is not an engineered minimum–maximum allowance.
Concept take-off, sections not designed — run the section sizing screen
Starting 5-bay model: 15,188 kg of modelled steel.
See exact scenarios and quantity basis
| Bays | Bay spacing (m) | Model steel (kg) | kg/m² | kg/sq ft |
|---|---|---|---|---|
| 4 | 7.50 | 14,046 | 31.21 | 2.900 |
| 5starting | 6.00 | 15,188 | 33.75 | 3.136 |
| 6 | 5.00 | 16,377 | 36.39 | 3.381 |
Primary / secondary / brace sections: BSP MB 300 × 140 · MC 100 × 50 · ISA 75 × 75 × 6
End-wall framing is enabled, matching a fresh editor preset; modelled end posts are included where walls are clad. This is net frame, secondary-member and plate mass. Procurement waste, cladding, civil works, furnishings and equipment loads remain separate. No price, safe capacity or design approval is inferred.
A furnished starting layout.
The current fit-out generator places 17 physical objects in this starting model. These counts come from that generated layout.
- 6Palletised goodsCement bag stack · Steel / tile stack
- 1Workshop benchBilling counter
- 3Storage rackHardware rack
- 1Storage cabinetRecords cabinet
- 4Linear light fixtureGeneral light
- 2Extinguisher positionFire equipment position (review required)
The 3.0 m central stripe is a planning reserve, not an approved exit route or vehicle swept-path result. Equipment is generic; confirm capacity, service clearances and actual loads separately.
Questions, answered.
A closer look at the building-material godown concept, its editable inputs and the decisions that belong in a project-specific design.
What are the starting dimensions of the building-material godown?
The preset starts at 15 m wide by 30 m long, with a 5.5 m eave and 5 bays along its length. You can edit these dimensions. They describe a concept starting form, not an operating capacity or approved structural design.
Can this layout store cement, tiles and steel together?
It is a generic merchant-yard concept. Decide the actual product types and segregate them according to handling, weather protection, loading and storage requirements before finalising the arrangement.
Does the floor design allow heavy building materials?
No slab or foundation capacity is established. Supply the stock weights, stacking pattern, rack reactions and handling-equipment loads to the structural designer.
Can trucks enter the open-front material shed?
The front wall cladding is omitted, but the frame is still present. Check vehicle approach, turning, unloading and clear height against the actual columns, braces and roof members.
Does the model steel range include stock racks?
It includes the building's modelled frame and plates. Storage racks and stock are separately placed objects with their own quantities, loads and pricing requirements.
Related shed concepts.
Make this starting point your own.