Skip to main content
A starting point for your project

Metal fabrication workshop design 18 × 30 m starting form

Map the route from incoming steel to workstations and dispatch. An open-front fabrication shell gives you a visible starting arrangement of workbenches, machine envelopes and material storage.

Furnished metal fabrication workshop 3D concept showing the frame and illustrative interior equipmentFURNISHED CONCEPT
Illustrative preset preview. Current starting inputs are listed below; inspect changes in the live editor.
Floor footprint
540 m²18 × 30 m width × length
Eave height
6 mCheck actual underside clearance
Bays along the length
5 bays6.00 m centre-to-centre
Wall arrangement
Three sides clad · open frontStructural members remain at openings
Same footprint. Three bay arrangements.

See what changes the steel quantity.

The range compares 4, 5, 6 bays at the same width, length, eave, roof, openings and selected sections. It describes those modelled arrangements; it is not an engineered minimum–maximum allowance.

29.4–34.4kg/m² of floor footprint
2.73–3.20kg/sq ft of floor footprint

Concept take-off, sections not designed — run the section sizing screen

Starting 5-bay model: 17,202 kg of modelled steel.

See exact scenarios and quantity basis
BaysBay spacing (m)Model steel (kg)kg/m²kg/sq ft
47.5015,86029.372.729
5starting6.0017,20231.862.959
65.0018,58934.423.198

Primary / secondary / brace sections: BSP MB 300 × 140 · MC 100 × 50 · ISA 75 × 75 × 6

End-wall framing is enabled, matching a fresh editor preset; modelled end posts are included where walls are clad. This is net frame, secondary-member and plate mass. Procurement waste, cladding, civil works, furnishings and equipment loads remain separate. No price, safe capacity or design approval is inferred.

More than an empty shell

A furnished starting layout.

The current fit-out generator places 15 physical objects in this starting model. These counts come from that generated layout.

  • 3
    Workshop benchFabrication bench · Assembly / inspection bench
  • 1
    Processing machineCutting / drilling machine envelope
  • 1
    Storage cabinetTool cabinet
  • 1
    Storage rackStock rack
  • 2
    Palletised goodsIncoming material pallet · Dispatch pallet
  • 1
    Utility sinkUtility sink
  • 4
    Linear light fixtureGeneral light
  • 2
    Extinguisher positionFire equipment position (review required)

The 3.0 m central stripe is a planning reserve, not an approved exit route or vehicle swept-path result. Equipment is generic; confirm capacity, service clearances and actual loads separately.

Before you build your brief

Questions, answered.

A closer look at the metal fabrication workshop concept, its editable inputs and the decisions that belong in a project-specific design.

What are the starting dimensions of the metal fabrication workshop?

The preset starts at 18 m wide by 30 m long, with a 6 m eave and 5 bays along its length. You can edit these dimensions. They describe a concept starting form, not an operating capacity or approved structural design.

Can I model a long-stock fabrication workflow?

Use the editor to arrange stock racks, cutting and assembly envelopes around the actual material lengths. Check handling paths and end clearances rather than assuming the central reserve accommodates every stock size.

Is welding extraction included?

The starting fit-out does not design fume extraction, ventilation, screens or electrical services. Establish the fabrication process and workstation requirements in the project brief.

Can I install an overhead crane in this fabrication shed?

Record a crane brief and coordinate its geometry with the separate tools. Crane actions, runway beams, supporting columns, connections and foundations require a dedicated structural design.

Does the steel range include fabricated products stored inside?

No. It measures the chosen building-frame scenario. Stock, machinery, racks and any manufactured product remain separate quantities and loads.

Explore another starting point
View all 20 concepts

Make this starting point your own.

Adjust the dimensions, roof, enclosure and equipment layout. Keep refining the actual project brief and engineering inputs alongside the model.

Start in 3D